in embankments for road, flood banks, margingal banks and guide banks etc. Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in all kinds of soil.Įarthwork in rough excavation by any means and banking/ filling excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller or minimum 8 tonnes and dressing up.